Some more update on the trailer

After all these years I have finally got the trailer to a stage where the body and frame work is done ( just a bit of cleaning up here and there to do )

As she is as of today






I'm only going to run a rail down the left hand side as this is where the 3 x 20ltr spare fuel/water jerry can are going , And down the right hand side the Gas bottle and 2x 100amh battery are going ( going to make up some box's for them)



Spare wheel carrier is going on the front there is room for a 33x12x15 spare same size as my xj runs or two 31x10x15 one to the front and to the back of mount





The frame work for the tent lifts open to the right hand side of the trailer and can be open when the tent is up or down ( I think it can )





Ok where to now Do you think I should paint it now or do the brake wiring etc and paint at the end ?????